Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 11 results ...

Chang, L M, Georgy, M E and AbdelRazig, Y A (2000) Warranting Quality of Steel Bridge Coating. Journal of Construction Engineering and Management, 126(05), 374–80.

Chua, D K H and Li, D (2000) Key Factors in Bid Reasoning Model. Journal of Construction Engineering and Management, 126(05), 349–57.

Hinze, J and Wilson, G (2000) Moving toward a Zero Injury Objective. Journal of Construction Engineering and Management, 126(05), 399–403.

Holland, N and Hinze, J (2000) Daylight Savings Time Changes and Construction Accidents. Journal of Construction Engineering and Management, 126(05), 404–6.

Luna, R and Wu, Y (2000) Simulation of Temperature and Stress Fields during RCC Dam Construction. Journal of Construction Engineering and Management, 126(05), 381–8.

Mitropoulos, P and Tatum, C B (2000) Forces Driving Adoption of New Information Technologies. Journal of Construction Engineering and Management, 126(05), 340–8.

Navon, R, Shapira, A and Shechori, Y (2000) Automated Rebar Constructability Diagnosis. Journal of Construction Engineering and Management, 126(05), 389–97.

O'Brien, W J and Fischer, M A (2000) Importance of Capacity Constraints to Construction Cost and Schedule. Journal of Construction Engineering and Management, 126(05), 366–73.

Palaneeswaran, E and Kumaraswamy, M M (2000) Contractor Selection for Design/Build Projects. Journal of Construction Engineering and Management, 126(05), 331–9.

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2000)126:5(331)
  • Abstract:
    As traditional construction procurement approaches are found to be inadequate in meeting the demands and challenges of recent times, alternative procurement routes such as through management contracting or build-operate-transfer are increasingly being adopted. Although design/build is one of the more popular alternative procurement methods that also has a long history, it does not appear to have well-established contractor selection procedures. This paper focuses on developing a model for contractor prequalification and bid evaluation in design/build projects. For this purpose, it presents a comparative overview of some international practices in the design/build contractor selection process. The overall objective is to identify the core aspects of selecting a suitable bidder in order to achieve the best “value for money.” The strengths and weaknesses of current practices of contractor selection are highlighted while identifying some of the best practices followed in design/build projects by various clients.

Schexnayder, C (2000) John F. Stevens—A Great Civil Engineer. Journal of Construction Engineering and Management, 126(05), 325–30.

Thomas, H R and Sanvido, V E (2000) Role of the Fabricator in Labor Productivity. Journal of Construction Engineering and Management, 126(05), 358–65.